Home

Syllabus

Instructors

Important Dates
(exam dates)

Slides
(Lectures slides+notes)

Assignments
(Rules+ assigments)

Course Materials
(end of chapter Qs)

Tawasol

Important Links

Project

Course Blog

Grades



Welcome girls to

Thurs. 20th of November: *New*

for all students, there will be no tutorials for the next week.

for group 23, contact me on nir_ksu@yahoo.com ASAP.


*IMPORTANT* for those who did not check the compatibility

for I.Bedour sections you can as she told you before to choose between HCL or Upgrade Advisor.

for I.Abeer sections you must submit that at least 2 from your devices is in HCL ( HCL has a search use it, do not search according to your lab top model but as she told you before to search by the internal device names that you can get it from the device manager).

So, if you don't want to lose your marks do the above according to your section and submit at Sat. to I. Joharah from 8 - 10, building 20 3rd floor.

Note that: this is for all the groups (I.Nurah's & I.Joharah's groups)

Wed 19th of November *updated* :

- Mid#2 exam date changed to Sat 29/12/1429. if you have any problem please vote in the blog .

 -  For I. Joharah students who didn't come to choose their evaluation time, they must come on Sat from 8 - 9 and from 9 - 10 (Assignment time), I will be inshallah on the third floor building No. 20.

Regards the evaluation time:

1- you have to be prepared befor your evaluation time.

2- evaluation will take place in building No. 20 third floor. 

Tue 18th of November  :

-Please make sure that your network is wireless network (no cables should be connected between the server and the router and no cables should be connected between the clients and the router)

>

Business Vista ( product key)

C836C-M332Y-X4XVG-R9DYB-9KW73

-

Mon 17th of November (new) :

-If you have any problem in the 1st Phase of the project please check the new post in the blog

thank you

- Mid#2 exam date changed to Sun 23/12/1429. if you have any problem please vote in the blog .

17th of November:

< />

- Assignment#5  has been uploaded

If you are facing problems in joining the domain, submit the report on Wed 19/11/2008 but submit the print screen of the joining stepOn Sat 22/11/2008.

If you submit the complete report on Wed 19/11/2008 your group will get 0.5 bonus

15th of November:

 we want to make the course blog as communication point for the girls to exchange their experience.

you will find a post to discuss the general problem in installing the Virtual PC

if you face a problem and find a solution for it Please share this solution with the girls

thank you ....

There are some notes about the project- phase#1:

· You should implement wireless network.

· It is difficult to rename the domain, you should install the server again in one of the laptops, no need to do portions installs it as virtual machine.

· Also if you do not want to upgrade the client to vista business or xp professional you can install the client in virtual machine.


 



Copyright © 2006 KSU-IT.com